Water & Wastewater Infrastructure
Panama City Lift Station 34
Panama City, Fl
Year completed: 2022
Value: 2.3M
Panhandle Engineering provided Construction Engineering & Inspection (CEI) services for the construction of this new master lift station project. This triplex station receives flows from a 30” influent pipe and includes provisions for odor control and emergency pumping operations. The site infrastructure included the odor control equipment, separate electrical control building, stormwater management pond, parking, and space for a future water storage tank.