This project involved the construction of an 850,000-gallon potable water ground storage tank(GST) at the City of Lynn Haven's Water Treatment Plant No.1. Construction also included:

  • Two -40HP variable frequency drive (VFD) high serve pumps (HSPs), each rated at 500 gpm.
  • Three=150 HP VFD HSOs, each rated at 2,000 gpm.
  • Connection of two existing GSTs¬†raw water wells pump so they can provide water to the suction of the HSPs.
  • Relocation of all temporary above ground piping below grade.
  • Replace existing chlorine feed system and install in a prefabricated fiberglass building.
  • Installation of a 750 KW diesel-powered generator.

Project Description

Client:City of Lynn Haven
Location:1100 Ohio Avenue, Lynn Haven, Florida
Year Completed:2016